Fase 1: Building chassis juli/augustus 2013


Fase 2: Installing Chains and engine september 2013


Fase 3: Design and Installation tracks November 2015-2016



Fase 4: Platework april-juni 2017




Fase 5: Finishing new Jcb engine maart 2018


Fase 6: Changing Gardner engine with Jcb mei 2018

Fase 7: Platework roof + 1st primer juni-juli 2018




Fase 8: Painting top layer juli 2018

Fase 9: Changing Hydropumps december 2018-januari 2019


Fase 10: Fase 11: Finishing Male sponsons/ Sponsorplate juni 2019


Fase 11: Installing 3 Emergency stops/ Lights/usb connection/Camera/Remote Control

Fase 12: installing shackles, spare wooden blocks september 2019
Fase 13: Pressure controll cabine january 2020

Phase 14: Rubber pads, octobre 2021

Phase 15: Finishing roof/ cabine + exhaustpipe + unditching beam, detailwork, 2022
Phase 16: Wireless RC, 2022-2023
Phase 17: New jcb hydro-engines 2023-2024
End Result